Design Evolution....Oh, Oh! Recalculate!

Lesson learned.....I hope! Once I decided on a different design to tie my six large blocks together, I basically did some quick measuring and figuring on the calculator, then I started cutting. I got partway through cutting my border sections from my remnant of tonal orange when I realized that for what I had in mind, I was going to be about one and a half strips short.

Oh, oh! Recalculate!

I did a quick adjustment to my design. Unfortunately, to get enough long strips to go across horizontally, I had to sew back together some of the sections I had cut. It doesn't look too bad since it was assembled and pressed, but doing it this way did create extra work.

It is so much safer to either use a pattern where someone else has done all the work to figure everything out or where I have graphed a design out on paper and double-checked all the measurements and math on both piece sizes and available fabric. But, some quilts don't work that way for me. I think next time I "evolve" a quilt design as I sew, I would do better to cut as I go.

Tuesday, October 29, 2013

Some Days Are Nuthin' 'Cept Try, Try Again

I broke away from my current quilt project--a big one--to try to complete a quilt for the VA hospital in Fresno as part of the "Quilters' Embrace" program of the GATEWAY QUILT GUILD. Being an "orange" person, I have this pattern that caught my eye almost a year ago. I was trying for the K.I.S.S. (Keep it simple, stupid) method by choosing a latticework of multi-color two inch squares (actually, two inch strips sewn in pairs and then cut in two inch wide sections) combining the olive drab and orange colors in the quilt and mixing them with the traditional patriotic colors.

By the time I finished sewing the three pairs of big blocks together, I (a) decided this was not K.I.S.S., and (b) wasn't sure if the two design elements were going to look right together. I put it away for a few nights and slept on it.

Monday I sewed together the horizontal row connecting four blocks together and stitched it to one row. Then I laid everything out to view what it would look like finished.

IT LOOKED AWFUL!!!!!

I ripped out the the latticework and went back to square one to choose how to connect these big blocks depicting today's Army in action. I came up with this:


I had to make two attempts to sew this design together. The first time, I got the stars upside down. I did more ripping out than stitching yesterday. Some days are like that.

I'm further behind than I was last week, but I think the end result will be more pleasing. The question is, will I get this finished by Veteran's Day?

Wednesday, October 9, 2013

So, What's With the Name?

I have other blogs, but decided to start one just for quilting.

You may ask, "What is with the name? Where did you come up with QUILT GATEWAY?"

I am a member of Gateway Quilters' Guild in Merced, California. I merely turned a couple of words around and --  wallah! -- Quilt Gateway.